top of page
bck.png

STAY FOCUSED AND SURVIVE

TM

Situation Reports / News / Updates / Reviews / After Action Reports

tra-contours_edited_edited_edited_edited_edited_edited_edited_edited.png

SITREP

tra-service-panel-4.webp

UPDATE / 6 November 2026 / Compliance / Operations

​

CASA Continues BVLOS Trial

Overview


CASA’s broad-area beyond visual line-of-sight (BVLOS) trial was due to end on 15 October 2026. CASA has confirmed it will continue while a long-term approach is developed. For short-notice UAV search, the trial keeps open a way to fly BVLOS over new areas without a fresh site-specific approval for each task. That only works if the groundwork is done before the call comes in.

​

Key points

​

  • Existing trial arrangements stay in place until CASA establishes an enduring approach.

  • CASA expects to open consultation in November 2026 on draft guidance, to be published as Annex B to AC 101-06.

  • The four pathways apply to ReOC holders flying drones of 25 kg or under, below 400 ft AGL. Each pathway sets limits on aircraft size, speed and population density.

  • Approvals last up to 12 months. BVLOS applications take several months to assess, and CASA will likely assess a BVLOS flight for first-time applicants.

  • Approval is broad, not blanket. Before any new area is flown, the operator’s nominated responsible person must complete a feasibility assessment and sign an area authorisation.

​

Operational implications


Broad-area approval doesn’t cover every location or flight. Whether an area is covered depends on the pathway, population density and distance from controlled aerodromes, and each area has to be assessed before it is flown. Aerial findings still have to reach the people coordinating the ground response. TRA’s UAV Operations Support links aerial search to the ground task, and Trail Search and Rescue covers casualty access and extraction.

​

Relevance to TRA


TRA’s UAV tasks can require immediate mobilisation or deployment within an hour of call-out. The search location isn’t known until the incident happens, so there is no time to obtain a task-specific approval. Under the broad-area model, everything that can be done in advance has to be done in advance:

​

  • feasibility assessments for likely search areas

  • airspace and stakeholder engagement

  • practised pre-launch procedures, including the aeronautical VHF broadcast required at least 15 minutes before launch

​

Approvals need to be in place before a task comes in, not sought once it’s underway. Every flight still stays within its approval conditions.

​

Key references

​

 

Contact TRA


To discuss UAV search support or remote response planning, contact

 

Trail Rescue Australia.
info@trailrescue.com.au · 0448 988 391

​

​

RELATED BRIEFS / .

​

Northern Territory Flag - Trail Rescue Australia

Trail Rescue Australia is a proud NT veteran owned business based in Alice Springs, NT & Mansfield, VIC

Man Down Foundation
Supporting Frontline Serving Members in Defence, Police and Emergency Services
  • Instagram
  • LinkedIn

ABN  23 128 921 979

Unless otherwise specified, all content and imagery is copyright Trail Rescue Australia

Privacy Policy

​​

bottom of page